Master Suite

I wish I could say our master bedroom and on-suite bath were finished. I feel it’s going to be awhile yet. Still have to do the crown molding and a few other trim pieces before we will call it done. We moved into the master bedroom a couple of days before Christmas and were able to start using the bath a week or so before that. My husband put the tile up without issue in the shower. I’m so proud of him as it was his first tile job. It’s marble subway tiles and we had to purchase a wet saw suitable for cutting stone. I found a brand new one on Craigslist for half the retail price. The box hadn’t even been opened. My husband also installed the wood butcherblock counter (that I stained and finished). He also installed the flooring, beadboard, sinks, faucets, glass shower enclosure and shower hardware. He replumbed the vanity sinks and installed the light fixtures. I did the hardware and cabinet knobs. We replaced the GFCI outlet together. (My one wish is that I could have added another outlet near the vanity table but that was not in the budget.) Thank goodness for YouTube with videos that showed how to do everything we couldn’t figure out on our own!

We both contributed to all the painting as well as my youngest son who did the green paint in the bedroom and all of the inside of our walk-in closet. I really don’t want to look at a paint roller for awhile. I’m so thankful for Mico’s help!

While the almost-finished project is a far stretch from what my expectations would be of a professional craftsman, I am happy with our results. I am very proud and appreciative of my husband’s hard work –especially since he usually only gets one day a week off from his regular labor-intensive job! Gracias me amor! (Now if I could just get him up on the ladder to install the crown molding!)

Here are some “before” pics of the bathroom as a reminder of what the bath looked like before:

Before 1

 

Before 3

Before 4

Before 5

 

Here are some renderings I did of the remodel design:

Opt 6 View 3

 

Opt 6 View 2

Opt 6 View 1

Opt 6 View 4

Here are the “after” pics of the bath:

Master 1

 

After 1

After 2

After 3

After 4

After 5

These are renderings I did of the master bedroom:

Master Bedroom Suite ~ view 1

Master Bedroom Suite ~ view 1

 

Master Bedroom Suite ~ view 2

Master Bedroom Suite ~ view 2

This is what it looks like now:

Master 3

 

Master 5

 

Master 2

 

Master 4

The over-all cost of this remodel was about $6,000. This included all the materials and the little bit of labor we hired which included moving the plumbing for the shower, installing the shower pan and installing the plush carpet in the bedroom. The brass bed (straight out of the ’80s and same genre as the the mobile home), came with the house. I want to try to refinish the cheap shiny brass finish to look like the antique brass of the beside wall lamps. Eventually, I’ll replace the door knobs to something that a little less ‘bright’ as well. I hear brass is back so I might be able to find something a little more updated.

The dressing table was a Craigslist find –it has a really heavy marble top that inspired the use of the marble subway tile for the shower. I think it must have come out of an old hotel. I am happy with most everything but the shower enclosure that we ordered online. It was manufactured in Canada and came via a New York distributor and was shipped to our home near the California Central Coast. Even though we saved a ton of money (I’m guessing about two-thirds the price of a custom glass shower), it was fraught with problems. The initial order included only the doors and was missing the side panel It was out of stock at the time this mistake was discovered. The base came in broken and they had to send another (also out of stock at the time)…  Over all, it took about four months to get this issue rectified. Even so there are small scratches on the stationary glass door and the frame was bent in one corner and a tiny divot in the replacement shower pan. These were discovered when we went to install them. Fortunately the divot is on the outside and can be repaired. No way were we going to wait another four months for replacements that may or may not come in perfect. I’d have to say the shower issues were the worst I’ve had to deal with regarding on-line product purchasing I’ve had to date. Everything else –counter tops, sinks, mirrors, hardware, flooring, tile (even the beadboard and trim) had no issues at all! Everything else was purchased from our local Home Depot.